
2010
-
Incorporated in Turkiye and successfully completed transactions of 100 MWp
2017
-
Pioneered the Ukrainian renewable energy market with 150 MWp in completed transactions
-
Operates 31 MWp of installed capacity across two active power plants


2020
-
Entered Italian market with 177 MWp of developed projects
-
Sold 114 MWp across three projects to Defic Globe
-
Managing an active pipeline of 63 MWp
2021
-
Entered Romanian market with 652 MWp of developed projects
-
Targetting an additional 300 MWp in the near future


2022
-
Sold 83 MWp across two projects to Defic Globe:
-
Olt 2 (18 MWp)
-
Gorj 1 (65 MWp)
-
2023
-
Sold 255 MWp across three projects sold
-
Dorj 1 (65 MWp to Metka-Mytilineos)
-
Olt 1 and Dolj 3 (190 MWp–Undisclosed Stock Exchange Listed world-known Company)
-
-
Olt 2 power plant (18 MWp) has been built and started production


2024
-
Sold 28,5 MWp across two projects to Defic Globe:
-
Olt 3, Olt 4 (21,3 MWp)
-
Valcea (7,2 MWp)
-
-
Recently completed construction and in operation:
-
Bressana, Italy (7,4 MWp, COD Jul/24)
-
Valcea, Romania (7,2 MWp, COD Dec/24)
-
-
Under construction:
-
Olt 3 & Olt 4, Romania (21,3 MWp, COD Apr/25)
-